ITEM EX5 - ANNEX 4EXECUTIVE – 15 APRIL 2003TRANSPORT CAPITAL PROGRAMME 2003/04 TO 2005/06Resource Appraisal (download as .doc file) DETAILED PROJECT APPRAISAL APPRAISAL NO: H170 NAME OF SCHEME: Highway Maintenance Programme Schemes: 2003/04 Proposed Start Year: 2003/04 Basis of estimate: Contract rates and recent prices for similar work 1. DESCRIPTION OF PROJECT The project comprises the following carriageway reconstruction and resurfacing schemes in the approved Highway Maintenance Programme 2003/04.
2. NEED FOR PROJECT/CONSISTENCY WITH STRUCTURE PLAN The schemes have been assessed as being needed to preserve the existing road network in a safe and satisfactory condition. They are consistent with the objectives and targets for Highway Maintenance set out in the Council’s Local Transport Plan. 3. PREFERRED OPTIONS/DETAILS OF SCHEME The schemes consist of strengthening failed or weak roads. The A4130 scheme will be carried out together with the construction of a cycle track alongside the road over the length of the scheme. 4. FUNDING Funding uses the agreed Transport element of Single Capital Pot credit approval. 5. FINANCIAL/STAFF IMPLICATIONS The total cost, including fees, is estimated at £1.620m. The works are all programmed to be completed in 2003/04. Some contract payments will be made in 2004/05. Babtie Group Ltd will design and supervise both the schemes. 6. ENVIRONMENTAL IMPLICATIONS Noise reducing road surfacing will be used where appropriate. 7. RESOURCE APPRAISAL The Resource Appraisal is attached. (download as .doc file)
RICHARD
DIX Contact Officer: Richard Dix, Tel: (01865) 815663 March 2002 Return to TOP |
|||||||||||||||||||||