ITEM BV10
BEST VALUE
COMMITTEE – 10 DECEMBER 2003
LIBRARY
SERVICE BEST VALUE REVIEW – SECOND IMPLEMENTATION UPDATE
Report by
the Head of Cultural Services
Introduction
- The review reported
on 27 March 2002 and its recommendations were endorsed at meetings of
the Learning & Culture Scrutiny Committee on 7 May and the Executive
on 14 May. In the context of a national decline in usage and issues,
the review established the reasons for this within Oxfordshire. These
included problems with stock selection and procurement (including under-buying
of the more popular titles), inconsistent customer service, unappealing
libraries, inadequate and inappropriate opening hours, a lack of effective
marketing and promotion, and an inadequate ICT system leading to inefficiencies
in service. Under-investment over many years had been damaging and,
while benchmarking data showed that we spent our money well, performance
was usually in the lower quartiles.
- The review produced
a five-year strategy to arrest the decline in the Service and
to make it a top quartile performer in all areas. Many of the improvements
identified would be met from efficiency savings, but it was acknowledged
that significant increases to opening hours would require additional
funding by the Council.
The
review identified 6 Key Service Improvement Areas:
- ICT
- Stock of Books
- Access and Social
Inclusion
- Information
Service
- Customer Service
- Performance
Management
- An Implementation
Plan was drawn up as required by the end of June 2002 and this was subsumed
within the Action Plan of the 2002 Annual Library Plan. In November
2002 the latter was assessed by the Department of Culture, Media &
Sport (DCMS) as being a "good planning tool" that demonstrated
a "good and realistic approach to meeting Public Library Standards"
and was "good in demonstrating that the authority was improving
its library service".
- The Audit Commission
Inspection took place during 2002 and in November of that year the
Service was judged as "fair" with "promising prospects for
improvement".
- In the summer
of this year, the Library Service was heavily involved with the Audit
Commission’s Whole Service Inspection of Cultural Services in
Oxfordshire, one of four national pilots that tested an innovative way
of assessing the quality of cultural provision and the likelihood of
improvement, with the expectation that this methodology would in future
be applied in the evaluation required of all local authorities’ cultural
services, feeding into Comprehensive Performance Assessments (CPAs).
In October the Inspection concluded that "Oxfordshire County Council
provides good cultural services which have promising prospects
for improvement" and that "the Council is making good progress
in delivering improvements in libraries".
- The Best Value
review of Oxfordshire’s Library Service is included in the recently
published report to the Office of the Deputy Prime Minister, Changing
to Improve – 10 Case Studies from the Evaluation of the Best Value Regime,
prepared by the Centre for Local and Regional Government Research at
Cardiff University. Drawing on qualitative research conducted as part
of the long-term evaluation of organisational change, the ten reviews
were chosen because they were "not just paper proposals but real
programmes of reform" that "do appear to have changed things".
- In 2003, DCMS
required each library authority to submit a Position Statement
by the end of September. This replaced the more detailed Annual Library
Plan and was to be assessed against the priorities outlined in the DCMS
report Framework for the Future – Libraries, Learning and Information
in the Next Decade (F4F), published last February (and
deposited in the Members’ Resource Room). In mid-November, the assessors
provided each authority with two scores for the Position Statement,
one covering the quality of the evidence that the authority is providing
excellent policies and practice to implement F4F, with the second covering
the approach to meeting Public Library Standards (PLS). Scores ranged
from 1 (weak) to 4 (excellent). For Oxfordshire, "the evidence of policies
and practice, and the policies and practice themselves" were assessed
as "good" (score 3) for the former and "fair" (score 2)
for the latter. The Standards score was based heavily on actual performance
at March 2003 with the result that 17% of all authorities received score
1 and a further 63% score 2. "Excellent" scores in each area were only
achieved by 7% and 2% of authorities respectively.
Current
Status
- The objectives
and service improvement targets for each of the six Service Improvement
Areas in the original report are reproduced below, together with an
indication of progress against the relevant target dates and other information.
|
Service
improvement 1
|
Information
and Communications Technology
|
|
Objective
|
- Have a fully
computerised book issue system in all libraries, providing excellent
management information on usage and allowing the public access
to the library catalogue via the internet to browse, reserve and
renew items on loan.
- Provide
free access to the latest information technology, together with
help and guidance in its use.
|
|
|
Proposed
service improvement targets
|
Completed
by
|
|
1
|
Meet DCMS standard
of 100% of libraries having access to an on-line catalogue (PLS5)
|
March 2003
- available
from 15.12.03
|
|
2
|
Free high-speed
internet access available to the public in all libraries
|
March 2003
- completed
|
|
3
|
Total number
of workstations available to the public to reach 0.5 per 1000 population
(PLS6)
|
March 2003
- 0.4 achieved,
0.5 will be achieved in 2003/04
|
|
4
|
All relevant
staff to have completed NOF funded ICT training programme
|
March 2004
- now Sept
2004
|
|
5
|
New library
management system (LMS) operational in all libraries
|
April 2004
- by Sept 2004
: see below
|
- The web-based
on-line catalogue will be available from 15th December,
following complicated data conversion and migration to the new system.
Anyone, anywhere in the world, with access to the Internet, will be
able to access Oxfordshire’s catalogue of books and other materials.
- On the same
date, the 13 libraries currently on the Genesis network will
‘go live’ on the new DS Galaxy LMS.
- In addition,
early in the New Year, users supplied with PIN numbers will have access
to further interactive services, including checking their borrower
records, renewing books and making reservations on-line.
- Existing resources
have been reallocated in both 2002/03 and 2003/04 to fund the accelerated
programme’s completion in 2004.
- In partnership
with Lifelong Learning and following on from the opening of the new
Learning Centre in the Central Library a year ago, the Blackbird Leys
Library and Learning Centre opened in April 2003 as an integrated
learning centre.
- The OCN fast
broadband network and over 200 new PCs with associated printers and
scanners installed as part of the People’s Network have resulted in
many more people making use of libraries, especially young adults,
one of our key target groups. This is reflected in the improved visitor
figures highlighted in Service Improvement 3 below.
- The NOF funded
ICT training for all staff (covering general ICT skills, electronic
information sources, etc.) has coincided with the need to train almost
500 staff (including casual reliefs) on the new Galaxy LMS
systems. The vast majority of staff are providing front line services
and their release for training needs to be carefully planned. This
joint pressure has meant that it will not be possible to complete
the NOF training programme until September 2004.
- It is not likely
that the new LMS will be available in all 50 libraries before September
2004. Significant time will need to be invested to research and test
the technical solutions to achieve the preferred option for the mobile
libraries of having a similar live ‘real time’ system to that in the
static libraries.
|
Service
improvement 2
|
Stock
of books
|
|
Objective
|
- Improve
the lending stock of books, including the purchase of more books
each year, more copies of the most popular titles, and an enhanced
range of titles overall.
- Significantly
increase the level of book issues
|
|
|
Proposed
service improvement targets
|
Completed
by
|
|
1
|
Allocation
of local funding to library managers to enable library-specific
purchasing
|
May 2002
- completed
|
|
2
|
All libraries
to have at least one copy of top 15 bestselling adult paperbacks
within one week of entry into list
|
May 2002
- completed
|
|
3
|
Number of adult
books purchased for lending per month to increase by 25%
|
May 2002
- see below
|
|
4
|
Annual items
added through purchase to exceed DCMS standard of 216 items (PLS17)
|
March 2005
- on target,
215 @ Mar 03
|
|
5
|
Meet DCMS standard
of 65% of adult users reporting success in finding a specific book
(PLS12(i))
|
March 2004
- see below
|
|
6
|
Annual book
purchases per 1000 population to exceed top quartile performance
of 202
|
March 2005
- on target
|
|
7
|
Books on loan
per 1000 population to increase by 28%
|
March 2006
|
|
8
|
Book issues
per head of population to reach top quartile performance of 9.1
(N.B. top quartile 2001-02 = 8.4)
|
March 2007
- on target
: 6.3 in 2002/03
|
- The ‘Top 15’
bestseller service introduced in June 2002 is still proving very popular
with readers and staff and helping to increase library issues. As
far as can be ascertained, Oxfordshire is the only authority with
‘Top 15’ coverage – other authorities with such a service only provide
‘Top 10’. The Service is now more responsive to such initiatives as
the current BBC Big Read promotion.
- The range of
titles bought for children and young people continues to be widened,
including the provision of more graphic novel collections. The latest
Harry Potter is a good example of recent changes – three times as
many copies ordered pre-publication and HQ staff worked on Saturday
of publication in order to get copies out to libraries the same day
or the following Monday.
- Only 10% more
books purchased in 2002/03 due to £60,000 underspend (due to planned
OCC budget holdback and late delivery by some suppliers). If included,
estimated increase would have been c18%. It is anticipated that the
target of 25% will be achieved in 2004/05.
- The Cipfa PLUS
survey taking place in all libraries at the end of November 2003 will
provide data for PLS12i above (% of users finding a specific book).
- Even allowing
for the closure of the Central Library for 3 months for major essential
repairs in 2001/02, book issues increased year-on in 2002/03 for the
first time in several years, thus bucking national trends. A comparison
of the figures for the last quarter of both years (January to March),
when Central Library closure is not a factor, shows book issues up
by 3% (7% in Central) and AV issues up by 5%. Indications are that
this overall trend has continued in the first half of 2003/04.
- Local stock
plans are now being used in each library. These are informing the
way library managers are spending their newly devolved budgets and
are feeding into the service planning processes.
|
Service
improvement 3
|
Access
and Social Inclusion
|
|
Objective
|
- Be open
at times that best suit the public, and deliver improved services
to those that do not have easy access to a branch library or are
not able to visit any kind of library
- Significantly
increase the number of visits to libraries
- Provide
for the needs of all the people of Oxfordshire, and respond quickly
to changes in those needs.
|
|
|
Proposed
service improvement targets
|
Completed
by
|
|
1
|
Meet DCMS standard
of 100% of larger libraries open at least 45 hours per week (PLS4)
|
May 2002
- completed
|
|
2
|
Social Inclusion
strategies for Service and for individual target groups completed.
|
Sept 2002
- detailed
work plans for each group drawn up : see below
|
|
3
|
12 largest
county libraries to be open all day on Saturdays
8 main town
libraries to have no mid-week closures
|
March 2004
March 2004
- to be implemented
from 1st Feb 04 : see below
|
|
4
|
Meet DCMS standard
for number of library visits per 1000 population (PLS11)
|
March 2004
- on target
|
|
5
|
Increase aggregate
opening hours per 1000 population to meet DCMS standard of 128 (PLS3(i))
|
March 2005
- see below
|
|
6
|
Proportion
of households living within 2 miles of a static library to increase
by 6% to 82% (PLS1(i))
|
March 2006
- completed
: see below
|
- As part of the
Service’s restructuring, new posts with Social Inclusion responsibilities
have been in place since the beginning of November 2002. Officers
have drawn up detailed work plans for improving services for the following
individual target groups: disabled people, people with hearing or
visual impairment, older people, housebound people (and their carers),
multicultural groups and young people aged 11 – 16. Rural isolation
is a theme running throughout all these plans and also the Mobile
Library Review. Good progress is being made on improving services,
with closer co-operation with other directorates and increased consultation
with users and other stakeholders. More detailed evidence was submitted
as part of the recent Position Statement to DCMS, but examples include:
- A review of
the selection and supply of Asian language books, spoken word and
videos/DVDs, together with improved display of such stock in libraries.
- Installation
of software to help visually impaired people on all People’s
Network PCs.
- Introduction
of Childminders tickets (to match service to pre-school playgroups).
- Improved services
for Looked after Children.
- Following a
successful pilot scheme at Bicester, book trolleys for elderly/disabled
readers are being introduced in to many larger libraries.
- The County Librarian
and other officers have been heavily involved with the proposed Asylum
Seekers Centre at Bicester. Although time consuming this work has
had the spin-off benefit of developing knowledge and expertise in
the Library Service of sources of materials for ethnic minority groups.
- For the 38 libraries
where visits are recorded throughout the year, year-on quarterly comparisons
show overall increases ranging from 5% to 7% (with 10% to 15% in the
Central Library).
- Opening hours
– A report was taken to the Executive in November 2002 recommending
a two phased approach to meeting the new Standards. Phase One has
been funded by the Council and will see a 97 hours per week increase
in opening hours in the larger libraries from 1 February 2004. For
various practical reasons, it has been agreed to retain one half day
per week closure in 7 main town libraries.
- A further Phase
Two paper was taken to the Executive in October 2003 (via the Learning
& Culture Scrutiny Committee), recommending cost effective solutions
to achieving the remaining 131 hours per week required to meet the
Standard. This was approved in principle for implementation from 1st
February 2005 and will be considered as part of the budget setting
process for 2004/05.
- The implementation
of both phases is also aiming to meet the ‘out of office hours’ Standard
of 30% (currently 23%). For the large libraries covered by Phase One,
the proportion of hours falling outside of weekdays ‘9 to 5’ will
increase from 22% to 29%, with some opening to 8.00 on certain evenings
and all opening all day on Saturdays.
- The above Phase
Two paper also included an interim report on the Mobile Library Review.
The recommendations in the latter will result in an extra 79 opening
hours per week. These would come from improved hours for a re-designated
Community Services vehicle, a new second Community Services vehicle,
half day Saturday crewing, some evening crewing and increased administrative
support at the mobiles’ base libraries in order to free off the crews
for more public service. As well as improved services to homes for
older people and day centres, there would be visits to a greater number
of rural primary schools.
- Recent figures
provided by DCMS as part of the annual Planning Profile indicate that,
contrary to earlier estimates, 87% of households live within 2 miles
of a static library.
|
Service
improvement 4
|
Information
Service
|
|
Objective
|
- Be the natural
choice for people wanting to find out information of any kind,
via any library, with the Central Library regarded as a ‘Centre
of Excellence’ for Oxfordshire.
- Increase
the number of enquiries and the public’s success in finding the
information they require.
|
|
|
Proposed
service improvement targets
|
Completed
by
|
|
1
|
Meet DCMS standard
of 95% of adult users rating the knowledge of staff as "good" or
"very good" (PLS14(i))
|
March 2003
- see below
|
|
2
|
All front line
staff to have received training in handling, assessing and, where
appropriate, referring information enquiries.
|
March 2003
– partly achieved: see below
|
|
3
|
Percentage
of adults reporting success in gaining information as a result of
a search or enquiry to exceed DCMS Standard of 75% by a further
10% (PLS13(i))
|
March 2006
- awaiting
Cipfa PLUS survey
|
|
4
|
Enquiries (in
person) per 1000 population to increase by 27% to 900
|
March 2006
– 15% increase achieved by 2002/03 : see below
|
- DCMS ‘knowledge
of staff’ Standard – In order to achieve more consistent comparisons,
it has been decided to move away from the previous practice of holding
the survey in a different third of libraries each year, to involving
all libraries every three years. This means that the next survey
will take place at the end of November 2003. Progress on this and
several indicators can then be checked in a consistent way (all libraries
were last surveyed in 2000/01, when the outcome for this indicator
was 93% for adult users and 100% for children).
- Information
training – NOF ICT training is meeting some of the requirements (e.g.
improvements to electronic information handling skills), but the pressures
(outlined in Service Improvement One above) of ensuring that all members
of staff receive the full range of both NOF and LMS ICT training will
cause further delay in fully meeting this target.
- Increased support
is continuing to be made available to enable the County Reference
& Information Librarian to develop and fulfil the strategic e-government
agenda more effectively.
- The Central
Library Review has now commenced and is addressing the development
of the library as a ‘centre of excellence’ for the information service.
In order to assess the impact of this change, a pilot is planned for
early in the New Year whereby Central will take over from the filter
reference libraries and act as the main referral centre for a number
of smaller libraries. From the end of 2003, librarians based in Central
will be participating in the national ‘Ask a Librarian’ email service.
The introduction of Internet PCs to staff enquiry counters has also
led to an improvement in the quality of the information service.
- The continuing
shift to electronic sources is speeding up considerably now that the
People’s Network PCs and OCN broadband network have been installed.
- It is envisaged
that in the near future members of the public will be able to make
enquiries by email.
- The number of
enquiries per thousand population increased from 699 in 2000/01 (there
was no count in 2001/02 due to Central’s long closure) to 803 in 2002/03,
a rise of 15%.
|
Service
improvement 5
|
Customer
Service
|
|
Objective
|
- Provide
a more welcoming, comfortable atmosphere where the public are
encouraged to stay for long periods
- Provide
higher standards of customer service and attain high levels of
public satisfaction.
|
|
|
Proposed
service improvement targets
|
Completed
by
|
|
1
|
All staff to
have received customer service training
|
March 2003
– partly achieved: see below
|
|
2
|
- Layout and
stock presentation improved in all libraries
- Review of
Central Library functions (including options for refurbishment)
completed.
- Refurbishment
programme plan for other libraries (taking account of the above)
completed.
|
March 2003
– see below
October 2002
– see below
November 2002
– see below
|
|
3
|
Meet DCMS standards
for the percentage of requests for books met within 15 days and
30 days (PLS9(ii) &(iii))
|
March 2004
– 2% short of target for 15 day Standard (will be achieved in 2004)
with 30 day Standard exceeded in both 2001 and 2002 : see below
|
|
4
|
Exceed the
DCMS standard for percentage of adult library users rating the helpfulness
of staff as "good" or "very good" by 1% to 96%
|
March 2004
– target met in 2001/02 (96%)
|
|
5
|
Meet DCMS standard
for the percentage of requests for books met within 7 days (PLS9(i))
|
March 2005
- see below
|
|
6
|
100% increase
in the number of requests per 1000 population (from 61 to 120)
|
March
2006
-
see below
|
- Customer service
training - As with information training in Service Improvement 4 above,
the intensive NOF ICT training of all staff is meeting some of the
requirements. Although the ICT training priorities outlined above
will mean that systematic customer care training for all staff will
have to be deferred until later in 2004/05, work has continued on
a local basis to improve the standards of customer care. A pilot workshop
on ‘Working effectively with service users’ has been held and preliminary
discussions have taken place with the new corporate Customer Services
Team.
- The original
target to have improved stock layout and presentation in all libraries
by the end of 2002/03 was over-ambitious. This is being progressed
via the development of the library stock plans and the work of the
Reader Development Team, the latter charged with disseminating best
practice around all libraries. Area Principal and Senior Librarians
are carrying out peer review visits to each others’ libraries in order
to draw up a plan for improvements in décor, lighting, comfort
and other amenities. However, the lack of a capital minor works budget
for the first half of 2004/04 has limited the Service’s capacity to
carry out improvements. The sum that was allocated in September will
be spent on the outstanding access improvements required to comply
with the Disability Discrimination Act in 2004 and other outstanding
priorities.
- The Library
Premises Review continues to examine all the options. Since 1999 work
on 21 of the 43 libraries has been completed or is in progress, using
varied and imaginative partnerships to refurbish and replace libraries
at minimal cost, e.g. Adderbury (2000), Wychwood (2001), Deddington
(2002), the Learning Centres at Central and Blackbird Leys (2002/03),
Kidlington (2003). Other improvement schemes in various stages of
development include Burford, Charlbury, Chipping Norton, Eynsham,
Hook Norton and Watlington.
- Central Library
Review – preliminary reports were taken to the Cultural Services Management
Team during the summer, together with a Design Consultant’s design
brief and indicative costs (£800,000 over 2 years). The latter has
been included as a 2-year scheme in the Preparation Pool of the Capital
Programme. Some improvements that would not compromise future solutions
have already been implemented. These include a more attractively laid
out Adult Fiction area, with coffee tables, comfortable seating and
state of the art paperback display units, and new tables and chairs
for older PC workstations.
- The most recent
addition to the mobile fleet (West) was awarded an honourable mention
in the State of the Art award at this year’s national Mobile
Meet. Judges thought that the vehicle was "thoroughly designed" and
"had the customer in mind".
- Request performance
continues to show improvement with the 30 day Standard of 85% exceeded
ahead of target by 1% and an improvement by 16% to 68% in the 15 day
Standard, just 2% below the Standard. The 7 day figure has improved
by 9% to 30%, but the Standard of 50% will not be achieved until full
computerisation of all libraries is completed in 2004.
- To increase
the number of requests, a reduction in the Standard book reservation
charge (from £1 to 70 pence) was introduced from April 2003. When
all the libraries are computerised on the new LMS, a proposal to reduce
the charge still further will be taken to the Executive later in 2004
as part of the Review of Charges process for 2005/06. It is anticipated
that the number of requests will also increase when the new on-line
services become available early in 2004.
|
Service
improvement 6
|
Performance
Management
|
|
Objective
|
- Provide
a cost-effective and well-managed service, offering excellent
value to the people of Oxfordshire.
|
|
|
Proposed
service improvement targets
|
Completed
by
|
|
1
|
Revised Management
Team in place
|
April 2002
- completed
|
|
2
|
Performance
management structure in place, with monthly or quarterly reporting
(as appropriate) on a selection of targets
|
July 2002
- completed
|
|
3
|
Preliminary
comparative assessment made on the performance of all libraries
against targets, with action plans drawn up to address shortfalls
|
March 2003
- see below
|
- The revised
Library Service staffing structure has been fully in place for just
over one year. This restructuring has meant that the Service now has
very able members of staff in key positions. In some instances, individuals
found themselves in very different roles, sometimes lacking in confidence
and/or specialist knowledge. Now, after a period of coaching, learning,
talking to others, etc., they are beginning to deliver. The key message
that the Library Strategic Management Team wants to empower individuals
is now understood and is being acted upon.
- Senior managers
and librarians, as well as individual libraries, now receive performance
data on a quarterly basis so that targets can be effectively monitored
(e.g. issues, visitor numbers, income).
- The first individual
performance targets for each library were drawn up early in 2003/04.
At the beginning of 2004/05, there will be a full formal assessment
of the performance of individual libraries against these targets.
- The Service
continues to maximise income, especially from its audiovisual (AV)
services. The latest Cipfa Actuals show Oxfordshire as being the second
highest performing English County for AV income per head of population.
- Virements from
existing budgets and increased income to meet agreed Best Value priorities
were actioned in both 2002/03 and 2003/04.
Conclusion
- To date, all actions
and targets remain in the Implementation Plan. Changes to some target
dates outlined above reflect realities and, as reported last year, with
hindsight some of these were too ambitious. There remains a determination
within the Service that all actions will be completed within the planned
five-year strategy. The Whole Service Inspection report noted that the
regular review of the improvement plan by Library Service senior managers
and the resetting of targets "to ensure effective delivery within realistic
time scales" demonstrated good practice.
- 15 out of the
26 Public Library Standards were met by March 2003 and it is anticipated
that a further 7 will be achieved by March 2004. This progress, together
with the many examples of improved performance outlined throughout this
report, indicates that, as a result of the improvements and changes
that have been achieved to date, the Library Service’s downward spiral
of usage has finally been reversed.
RECOMMENDATION
- The Committee
is RECOMMENDED to:
- agree
if and when there is a need to report back to the Committee
on further progress;
- identify
whether there are any matters in the report which should be
drawn to the attention of the Executive Member; and
- ask
the Chair of the Learning & Culture Scrutiny Committee to
consult the Deputy Chair on scrutiny committee consideration.
RICHARD
MUNRO
Head of Cultural
Services
Background
Papers: Nil
Contact
Officers:
Rex Harris, Assistant County Librarian (Performance & Development)
Tel: 01865 810234
Andrew Coggins, County Librarian Tel: 01865 810212