Cabinet Member: Highways Construction and Repair
Forward Plan Ref: 2026/163
Key Decision
Contact: Mo Fazlie, Senior Project Manager – A40 Programme (Mo.Fazlie@oxfordshire.gov.uk)
Report by Director of Environment and Highways (CMDHCR6).
The Cabinet Member is
RECOMMENDED to:
a)
Approve the award of contract (NEC4
Engineering and Construction Contract, Pricing Option C with secondary Option
X22), to M-Group Highways Limited (reg#13007933) for an estimated total value
of £4,855,610 (ex VAT), for the HIF2 – Wolvercote Bridge Strengthening and
Maintenance Works Scheme under the Pagabo Civil and Infrastructure Framework
(Lot 1).
Additional documents:
Minutes:
The Chair introduced the item to the meeting.
The Chair noted the Council had been looking at ways to improve the A40 corridor for a long time, through bus lanes and active travel infrastructure. The Chair further noted that this issue was time-sensitive given the bridge strengthening works proposed were on a Network Rail bridge which needed to be handed back to them.
The Chair thanked officers and agreed to the recommendations in the report.
RESOLVED to:
a)
Approve the award of contract (NEC4
Engineering and Construction Contract, Pricing Option C with secondary Option
X22), to M-Group Highways Limited (reg#13007933) for an estimated total value
of £4,855,610 (ex VAT), for the HIF2 – Wolvercote Bridge Strengthening and
Maintenance Works Scheme under the Pagabo Civil and Infrastructure Framework
(Lot 1).